Silica Sand



Organ Kemering Ilir, South Sumatera

We have obtained the right to operate the WMP mining area in Orki Regency, South Sumatra, which has 188 hectares of production land and reserves of 30 million tons, with a silica content of more than 99.5% and a ferric oxide content of less than 100ppm. We have obtained a total production quota of 1.5 million tons from 2024 to 2026 (RKAB).